Acc. No. | Date | Document title | Authors | File |
0408722 | 1953-05-26 | MEMO TO K E FIELDS, SUBJECT: COMMISSION REQUEST FOR REPORT CONCERNING ELEVENTH SHOT ( UPSHOT-KNOTHOLE OPERATION ) | SNAPP R B | PDF |
0408746 | 1953-05-26 | MEMO TO L L STRAUSS, SUBJECT: COMMISSION HAS EVALUATED THE RISK IN THIS EVENT AND IS CONFIDENT THAT THE DEVICE CAN BE DETONATED SAFELY | DEAN G | PDF |
0405875 | 1953-05-27 | MEMO TO D L NARVER, SUBJECT: TRANSMITTAL OF AS-BUILT LOCATION - ELMER | DIETZE H L | PDF |
0405876 | 1953-05-27 | TWX, SUBJECT: RE ENIWETOK | NARVER D | PDF |
0405877 | 1953-05-27 | TWX, SUBJECT: REF DRAWING ONE TWO ZERO FIVE DASH EASY EASY DASH TWO | DIETZE | PDF |
0410589 | 1953-05-27 | LETTER TO E S HUMPHREY, SUBJECT: REIMBURSEMENT OF FUNDS FROM DEPARTMENT OF DEFENSE FOR WORK PERFORMED BY LASL FOR PROJECT 4.1, OPERATION UPSHOT-KNOTHOLE | TOLLIVER | PDF |
0406542 | 1953-05-27 | TWX, SUBJECT: YOU MAY PROCEED WITH YOUR PROPOSED WORK ON DOG THRU GEORGE GROUP | UNK | PDF |
0406543 | 1953-05-27 | TWX, SUBJECT: CONSTRUCTION OF AVR FACILITIES AT SITE TARE IN THE AMOUNT OF 23 DOLLARS 360 IS APPROVED AS SUBMITTED WITH YOUR MEMO REC SEVEN ZERO SIX DATED MAY TWO ONE REF PG-8-2254 | UNK | PDF |
0406544 | 1953-05-27 | MEMO TO D C VANDINE, SUBJECT: RE: PRIORITY TELETYPE 1685 - CONSTRUCTION CAMPS AT BIKINI | BOWEN E G | PDF |
0406688 | 1953-05-27 | TWX, SUBJECT: RE DECONTAMINATION OF AREA ON JANET | UNK | PDF |
0406985 | 1953-05-27 | MEMO TO CHAIRMAN, AEC, SUBJECT: INCREASE IN ALLOWANCE OF FISSIONABLE MATERIAL FOR EXPENDITURE IN OPERATION UPSHOT-KNOTHOLE | LAY J S | PDF |
0406986 | 1953-05-27 | MEMO, SUBJECT: INCREASE IN ALLOWANCE OF FISSIONABLE MATERIAL FOR EXPENDITURE IN OPERATION UPSHOT-KNOTHOLE | EISENHOWER D | PDF |
0073863 | 1953-05-27 | LETTER TO W S COLE, SUBJECT: OUTLINE EFFECTS OF RECENT PROPOSED REDUCED EFFORTS ON AIRCRAFT NUCLEAR PROPULSION PROGRAM | DEAN G | PDF |
0074219 | 1953-05-27 | LETTER TO W S COLE, SUBJECT: FULL SCALE TEST CONFIRMATION (ENCL: DRAFT PRESS RELEASE) (DELETED) | DEAN G | PDF |
0409206 | 1953-05-28 | ATOMIC ENERGY COMMISSION - MILITARY LIAISON COMMITTEE AGENDA FOR EIGHT-FIRST CONFERENCE 2:00 P.M., THURSDAY, MAY 28, 1953 | UNK | PDF |
0409207 | 1953-05-28 | ATOMIC ENERGY COMMISSION - MILITARY LIAISON COMMITTEE MINUTES OF EIGHT-FIRST CONFERENCE | UNK | PDF |
0406690 | 1953-05-28 | TWX, SUBJECT: DESIRE HYDROGRAPHY TO APPROX PLUS OR MINUS ONE FOOT WITHIN THE FOLLOWING BIKINI AREAS | NARVER D | PDF |
0404000 | 1953-05-28 | TWX TO J C BUGHER, ET AL, SUBJECT: FALLOUT DATA IN RELATION TO YIELD IN PREPARATION FOR GABRIEL TASK GROUP MEETING | FRY B | PDF |
0409445 | 1953-05-28 | MEMO TO R B SNAPP, SUBJECT: JOINT TASK FORCE LETTER DATED 21 APRIL 1953 | ROLANDER C A | PDF |
0409446 | 1953-05-28 | CASTLE - 81ST AEC-MLC MEETING, 5/28/53 | NONE | PDF |
0405873 | 1953-05-29 | MEMO TO H L DIETZE, SUBJECT: SECURITY FENCING - FRESH WATER STORAGE - ELMER | NARVER D L | PDF |
0411427 | 1953-05-29 | TWX TO CHIEF, AFSWP, ET AL, SUBJECT: FOLLOWING SCHEDULE NOW UNDER CONSIDERATION (DELETED) | UNK | PDF |
0411961 | 1953-05-29 | NOTE BY THE THE GENERAL MANAGER, SUBJECT: PROGRESS REPORT TO THE JOINT COMMITTEE DECEMBER 1952 THROUGH MAY 1953 (DELETED) | BOYER M W | PDF |
0406687 | 1953-05-29 | MEMO TO D L NARVER, SUBJECT: TRANSMITTAL OF SURVEY DATA | DIETZE H L | PDF |
0406988 | 1953-05-29 | MEMO TO SECRETARY OF STATE, ET AL, SUBJECT: INCREASE IN ALLOWANCE OF FISSIONABLE MATERIAL FOR EXPENDITURE IN OPERATION UPSHOT-KNOTHOLE | LAY J S | PDF |
0408720 | 1953-05-30 | PRESS RELEASE, SUBJECT: ELEVENTH TEST DETONATION IN THE SPRING 1953 SERIES IS SCHEDULED TO BE FIRED AT THE NEVADA PROVING GROUNDS | UNK | PDF |
0405173 | 1953-06 | MONTHLY STATUS AND PROGRESS REPORT - DIVISION OF BIOLOGY AND MEDICINE MONTH OF JUNE, 1953 | UNK | PDF |
0015197 | 1953-06 | OPERATION ORDER NO. 1-53 (CASTLE) (DELETED) | CLARKSON P W | PDF |
0034696 | 1953-06 | OPERATION IVY - REPORT TO THE SCIENTIFIC DIRECTOR - RADIOBIOLOGICAL STUDIES AT ENIWETOK BEFORE AND AFTER MIKE SHOT - PROJECT 11.5 | DONALDSON L R | PDF |
0051009 | 1953-06 | OPERATION TUMBLER SNAPPER, REPORT TO THE TEST DIRECTOR, TEST OF SCINTILLATOR OPTICAL-PATH TECHNIQUE (DELETED) | KRAUSE E H, BERGSTRALH T A, BEACH L A, GOLIAN S E, MILLER D V, MOSKOWITZ B R, MCCOY A E, MARLOW K W, ROBISON H I, TROGDON F H, CAMPBELL N M, FRAME J M, MCCROSKEY G L, COOK D C | PDF |
0051104 | 1953-06 | OPERATION UPSHOT-KNOTHOLE, BLAST EFFECTS ON B-36 TYPE AIRCRAFT IN FLIGHT, PROJECT 5.3 (MARCH - JUNE 1953) | PURKEY G F | PDF |
0407674 | 1953-06 | MONTHLY REVIEW OF ACTIVITIES MAY 1953 | UNK | PDF |
0411773 | 1953-06 | INTERROGATION FORM - AEC - FOR CLOUD PENETRATION REPORTS FOR THE CLIMAX EVENT, UPSHOT-KNOTHOLE OPERATION | MCQUOWN, WRIGHT W N, STANG L G, BRUCE, MEINKE, ROSE, ELLINGSON, MARKHAM | PDF |
0406689 | 1953-06-01 | MEMO TO H L DIETZE, SUBJECT: TRIANGULATION RECORDS | NARVER D L | PDF |
0406962 | 1953-06-01 | MEMO TO R CUTLER, SUBJECT: OPERATION CASTLE | DEAN G | PDF |
0051063 | 1953-06-01 | OPERATION IVY - PROJECT 6.2, REPORT TO THE SCIENTIFIC DIRECTOR: BLAST-WAVE MASS-MOTION MEASUREMENTS (DELETED) | SEACORD D F | PDF |
0072736 | 1953-06-01 | MEMO TO R CUTLER, SUBJECT: REASONS FOR REQUEST FOR AUTHORIZATION TO EXPEND FISSIONABLE MATERIAL IN AN ADDITIONAL SHOT AT NTS (DELETED) | DEAN G | PDF |
0403998 | 1953-06-01 | MEMO TO W D CLAUS, SUBJECT: APPROXIMATE YIELDS OF SHOTS FROM OPERATION TUMBLER-SNAPPER THRU OPERATION UPSHOT-KNOTHOLE | HUSTON V G | PDF |
0405176 | 1953-06-02 | MEMO TO R D ONEILL, ET AL, SUBJECT: SCHEDULE FOR MONTHLY STATUS AND PROGRESS REPORTS FOR MAY 1953 | BURCHARD J H | PDF |
0406685 | 1953-06-02 | TWX, SUBJECT: REUR ENGMSG ONE SEVEN EIGHT FOUR, FOX WAS DELETED | NARVER D | PDF |
0406686 | 1953-06-02 | TWX, SUBJECT: REVISED LIST PER HOW NAN SEVEN SIX SIX ONE OMITS SITE FOX | UNK | PDF |
0406541 | 1953-06-03 | MEMO TO W C CHENOWETH, SUBJECT: RE: STATION 20 - SITE CHARLIE - PROCUREMENT | GUNNELL V C | PDF |
0406684 | 1953-06-04 | SURVEY REQUIREMENTS | NONE | PDF |
0404786 | 1953-06-04 | MEMO TO K KASSCHAU, SUBJECT: 1954 BIOLOGY RESEARCH CONFERENCE ( ENCL; PROPOSED PROGRAM FOR RESEARCH CONFERENCE ) | LARSON C E | PDF |
0411840 | 1953-06-04 | INTERROGATION FORM - CLOUD SAMPLING REPORTS - UPSHOT-KNOTHOLE OPERATION ( CLIMAX EVENT ) | MCQUOWN, WRIGHT W N, STANGE L G, BRUCE, MEINKE, ROSE, SCHMIDT, ELLINGSON, MARRHAM | Missing |
0411403 | 1953-06-05 | MEMO TO COMMANDER, JTF7, SUBJECT: CLOUD SAMPLING - COCKPIT RADIATION INTENSITY METER | HOOPER P L | PDF |
0406682 | 1953-06-06 | MEMO TO D L NARVER, SUBJECT: TRANSMITTAL OF SURVEY DATA | MCDANIEL I B | PDF |
0406681 | 1953-06-08 | MEMO TO D L NARVER, SUBJECT: TRANSMITTAL OF SURVEY DATA | MCDANIEL I B | PDF |
0406539 | 1953-06-09 | MEMO TO W C CHENOWETH, SUBJECT: RE: STATIONS 101, 102 AND 103 PROCUREMENT | GUNNELL V C | PDF |
0406540 | 1953-06-09 | MEMO, SUBJECT: RE: CURRENT COST ESTIMATES - SITE CHARLIE | EAST C L | PDF |