Acc. No. | Date | Document title | Authors | File |
0406485 | 1953-08-11 | TWX, SUBJECT: CONFIRM TOWER ORIENTATIONS SHOWN DRAWINGS TOW TWO THREE THREE NAN ABLE ONE SEVEN AND TWO TWO THREE SEVEN EASY EASY ONE SEVEN SUPERSEDE ORIENTATIONS SIX THREE THREE NAN ABLE THREE | BOETTCHER | PDF |
0406486 | 1953-08-11 | TWX, SUBJECT: PRELIMINARY DRAWING FOUR TWO FOUR SEVEN UNCLE FOUR | BOETTCHER | PDF |
0407673 | 1953-08-11 | MEMO TO M W BOYER, SUBJECT: MONTHLY STATUS AND PROGRESS REPORT, JULY 1953 -- DIVISION OF BIOLOGY AND MEDICINE ( ENCLOSED ) | BUGHER J C | PDF |
0410205 | 1953-08-11 | LETTER TO DR BUGHER, SUBJECT: RADSAFE MONITORING PLAN ( ENCL: MEMO TO COMMANDER IN CHIEF, SUBJECT: RADIOLOGICAL HAZARDS IN THE MARSHALL ISLANDS AREA DURING OPERATION CASTLE, DTD 7-30-53 ) | CUSHING R H, CLARKSON P W | PDF |
0410841 | 1953-08-11 | LETTER TO J C BUGHER, SUBJECT: PROPOSED RAD-SAFE MONITORING PLAN OUTLINED ( ENCL: MEMO, SUBJECT: RADIOLOGICAL HAZARDS IN THE MARSHALL ISLANDS AREA DURING OPERATION CASTLE, DTD 7/30/53 ) | CLARKSON P W | PDF |
0403974 | 1953-08-11 | MEMO TO K KASSCHAU, SUBJECT: SUMMARY OF INFORMATION EXCHANGED AT HARWELL AND LONDON, ENGLAND, COPENHAGEN, DENMARK, AND STOCKHOLM, SWEDEN JULY, 1953 | MORGAN K Z | PDF |
0403975 | 1953-08-11 | MEMO TO K KASSCHAU, ET AL, SUBJECT: SUMMARY OF INFORMATION EXCHANGED AT HARWELL AND LONDON, ENGLAND, COPENHAGEN, DENMARK, AND STOCKHOLM, SWEDEN DURING JULY, 1953 | MORGAN K Z | PDF |
0409346 | 1953-08-11 | NOTE BY THE SECRETARY, SUBJECT: PLANNING FOR OPERATION CASTLE ( ATTACHMENT ) | SNAPP R B | PDF |
0406478 | 1953-08-12 | MEMO TO D L NARVER, SUBJECT: SAND SPITS FOR PROJECT 1.2B | BOETTCHER R A | PDF |
0406479 | 1953-08-12 | TWX, SUBJECT: AUXILIARY EXHAUST HEADER ABOVE FAN ABLE DOES NOT LEAVE BLDG AND IS TO BE REMOVED | NARVER D | PDF |
0406480 | 1953-08-12 | TWX, SUBJECT: REQUEST FURTHER CLARIFICATION OF REQUIREMENTS FOR DUKW RAMP LOCATION | UNK | PDF |
0406481 | 1953-08-12 | TWX, SUBJECT: CONSTRUCTION ANTICIPATES STARTING CONSTRUCTION OF STATION SIX ZERO IMMEDIATELY | NONE | PDF |
0406482 | 1953-08-12 | TWX, SUBJECT: LASL WILL TRY TO PUT DUKW RAMP ON OCEANSIDE AND TO UTILIZE THE ISLAND AS YOU HAVE CONSTRUCTED IT | NARVER D | PDF |
0407675 | 1953-08-12 | MONTHLY STATUS AND PROGRESS REPORT JULY 1953 PART II | NONE | PDF |
0405852 | 1953-08-12 | LETTER TO D L NARVER, SUBJECT: DRAWINGS OF THE ENIWETOK BIOLOGICAL STATION DESIGNATED BUILDING 218 - ELMER | WILBUR K M | PDF |
0405853 | 1953-08-12 | TWX, SUBJECT: ERECTION DIAGRAM REQUIRED | BOETTCHER | PDF |
0406257 | 1953-08-13 | TWX TO BOETTCHER, SUBJECT: DESIRE LOCATION OF BUILDING 256 FRED AND LOCATION OF LANDING RAMP ON SALLY | NARVER D | PDF |
0406258 | 1953-08-13 | TWX TO D NARVER, SUBJECT: MARCH 12 SHOWS HIGH TIDE LINE AND TRIANGULATION STATIONS | BOETTCHER | PDF |
0406259 | 1953-08-13 | TWX TO BOETTCHER, SUBJECT: LOCATION OF STATION 1302.02 IS NORTH 146250 AND EAST 171050 | NARVER D | PDF |
0406260 | 1953-08-13 | TWX TO BOETTCHER, SUBJECT: NEED FOLLOWING TO ANSWER ENGMSG 2933 | NARVER D | PDF |
0406473 | 1953-08-13 | TWX, SUBJECT: SPAIN INDICATES SHUMWAY OF LASL WILL MAKE A PERSONAL INSPECTION OF THE TREE STAND AND DETERMINE FEASIBILITY OF THIS PROPOSED PROJECT | NARVER D | PDF |
0406474 | 1953-08-13 | TWX, SUBJECT: EIGHT SEVEN SEVEN EIGHT DRAWING TWO TWO ZERO NINE | BOETTCHER | PDF |
0406475 | 1953-08-13 | TWX, SUBJECT: LOCATION OF STATION ONE THREE ZERO TWO PNT ZERO TWO IS NORTH ONE FOUR SIX TWO FIVE ZERO AND EAST ONE SEVEN ONE ZERO FIVE ZERO | NARVER D | PDF |
0406476 | 1953-08-13 | TWX, SUBJECT: APPROXIMATE PEAK ELEVATIONS BETWEEN STATION TWO ZERO AND STATIONS ONE FOUR ZERO TWO CMM ONE FOUR ZERO THREE PNT ZERO ONE CMM ONE FOUR ZERO THREE PNT ZERO TWO | NARVER D | PDF |
0406477 | 1953-08-13 | MEMO TO D L NARVER, SUBJECT: TRANSMITTAL OF PRINTS | BOETTCHER R A | PDF |
0072317 | 1953-08-13 | AEC MEETING MINUTES NO. 893, DTD 7-23-53, SUBJECT: DISCUSSION WITH MR. GRAVES ON CASTLE PROGRAM (DELETED) | SNAPP R B | PDF |
0073290 | 1953-08-13 | AEC GENERAL ADVISORY COMMITTEE MEETING NO. 36, AUG 17-19, 1953, SUBJECT: WEAPONS, HORN AND GABRIEL; CIVIL POWER; RESEARCH | DODSON R W | PDF |
0412055 | 1953-08-13 | AEC MEETING 893, SUBJECT: 2:15 P.M. THURSDAY JULY 23, 1953 DISCUSSION WITH MR. GRAVES ON CASTLE PROGRAM (DELETED) | SNAPP R B | PDF |
0408494 | 1953-08-13 | 36TH MEETING OF THE GENERAL ADVISORY COMMITTEE TO BE HELD IN ROOM 213 AUGUST 17, 18, AND 19 | DODSON R W | PDF |
0408970 | 1953-08-13 | MEMO TO FIELDS, SUBJECT: " SECRET " VERSION OF IVY FILM | STRAUSS L L | PDF |
0409345 | 1953-08-13 | LETTER TO P W CLARKSON, SUBJECT: NEW OUTLINE ON THE COMMISSION'S FILE REQUIREMENTS FOR CASTLE | FIELDS K E | PDF |
0404024 | 1953-08-13 | LETTER TO R CHESNEY, SUBJECT: OPERATION CASTLE ( NO ATTACHMENTS ) | BUGHER J C | PDF |
0406253 | 1953-08-14 | TWX TO HOWELL, SUBJECT: HOME OFFICE APPLIED A CORRECTION TO THE BEARINGS OF THE EASY GEORGE GROUP OF ZERO DEGREES 8 MINUTES 55 SECONDS | NARVER D | PDF |
0406255 | 1953-08-14 | TWX TO D NARVER, SUBJECT: REQUEST TO FURNISH HOME OFFICE DEVELOPED COORDINATES FOR PETER ITEM 1-10 DOG AND 1-27 ON GEORGE FROM TRAVERSE SHOWN | UNK | PDF |
0406256 | 1953-08-14 | TWX TO BOETTCHER, SUBJECT: WHEN CAN WE EXPECT RESULTS OF LOCAL TRIANGULATION REFERRED TO IN OUR MEMO 7302 OF AUGUST 5 | NARVER D | PDF |
0406470 | 1953-08-14 | TWX, SUBJECT: REQUEST YOU FURNISH HOME OFFICE DEVELOPED COORDINATES FOR PETER ITEM ONE THRU TEN ON SITE DOG AND ONE THRU TWO SEVEN ON SITE GEORGE FROM TRAVERSE SHOWN ON FS RPT FS FIVE ZERO ONE THREE | UNK | PDF |
0406471 | 1953-08-14 | TWX, SUBJECT: STOP ALL WORK ON SCIENTIFIC STATIONS ONE ONE FIVE | UNK | PDF |
0406472 | 1953-08-14 | TWX, SUBJECT: CONCRETE WALL IN STATION ONE TWO ZERO ONE UNDERGOING REVISION | NARVER D | PDF |
0405841 | 1953-08-14 | TWX, SUBJECT: REUR ENGMSG THREE TWO ONE SEVEN DEFER ACTION UNTIL SPAIN ANY MYSELF ARRIVE AT JOBSITE LAST WEEK OF AUGUST | NARVER D | PDF |
0405842 | 1953-08-14 | TWX, SUBJECT: EXCHANGE SECURITY LIGHTS PURCHASED FOR ASSEMBLY AREA AT ELMER WITH THOSE INSTALLED AROUND ADMINISTRATION COMPOUND TO DECREASE GLARE EFFECT IN BARRACKS AREA | UNK | PDF |
0405843 | 1953-08-14 | TWX, SUBJECT: ENGINEERING DOING THE DESIGN AND DRAWINGS FOR PARACHUTE TOWER AND CONCRETE FLOOR IN BLDG ONE ONE EIGHT QUES | UNK | PDF |
0408968 | 1953-08-14 | LETTER TO L STRAUSS, SUBJECT: CONVERSATION ON THE PACIFIC TEST FILM AND THE PROSPECTS OF A PUBLIC RELEASE ON IT THIS FALL ( COMP DOCUMENTS ARE 408967,408969 ) | PETERSON V | PDF |
0017864 | 1953-08-15 | OPERATION CASTLE, OPERATION ORDER TASK GROUP 7.4, NUMBER 1-53, 15 AUGUST 1953 | ESTES H M | PDF |
0000881 | 1953-08-17 | AEC-GAC MEETING NO. 36, AUGUST 17-19 1953, WASHINGTON, DC, SUBJECT: EXTENSION OF PROJECT GABRIEL UNDER THE NAME SUNSHINE - SCOPE OF PROJECT SUNSHINE ( GENERAL ADVISORY COMMITTEE ) (DELETED) | DODSON R W | PDF |
0117283 | 1953-08-17 | LETTER TO DISTRIBUTION, SUBJECT: GENERAL CONCEPT OF OPERATION CASTLE (REVISION #1) (CASTLE OPERATION) (DELETED) (PARTIAL) (J-19161) | HOOPER P L | PDF |
0406250 | 1953-08-17 | MEMO TO R A BOETTCHER, SUBJECT: ENGINEERING MESSAGE 8844 | NARVER D L | PDF |
0406251 | 1953-08-17 | TWX TO D NARVE, SUBJECT: FIELD APPROVAL OBTAINED WIDENING DOG DASH GEORGE CAUSEWAYS | BOETTCHER | PDF |
0406252 | 1953-08-17 | TWX TO D NARVER, SUBJECT: ESTIMATED PEAK ELEVATIONS PLUS 12 WITH TOPOGRAPHY GENERALLY FLAT AND NOR RPT NOT HIGHER THAN PLUS 8 | BOETTCHER | PDF |
0406254 | 1953-08-17 | TWX TO D NARVER, SUBJECT: FOX SUGAR NINE 45 TRANSMITTED 7 AUGUST BY OBOE SLASH SUGAR 6580 | BOETTCHER | PDF |
0406463 | 1953-08-17 | TWX, SUBJECT: LEAD DASH INS MAY FOLLOW EXISTING TERRAIN | NARVER D | PDF |