| 0406124 | 1953-12-17 | LETTER TO C M BACIGALUPI, SUBJECT: REQUEST FOR PRINTS | NARVER D L | PDF |
| 0409315 | 1953-12-17 | MEMO TO L L STRAUSS, SUBJECT: CHART AND PHOTOS OF BIKINI CONSTRUCTION ( NO ATTACHMENTS ) | SNAPP R B | PDF |
| 0406294 | 1953-12-18 | TWX, SUBJECT: DWG THREE FOUR FIVE EIGHT APPROVED WITHOUT CHANGE | NARVER D | PDF |
| 0406295 | 1953-12-18 | TWX, SUBJECT: CLIP ANGLES OR BENT PLATES MAY BE WELDED TO ATTACHED MEMBERS | NARVER D | PDF |
| 0406297 | 1953-12-18 | TWX, SUBJECT: PRELIMINARY DWGS THREE FOUR FIVE TWO CMM THREE FOUR FIVE ONE CMM AND SIX FOUR ZERO THREE APPROVED WITHOUT CHANGE | NARVER D | PDF |
| 0073522 | 1953-12-18 | LETTER TO J J FLAHERTY, SUBJECT: PROPOSED TECHNICAL PROGRAM OF THE DMA, 1954 - 1955 (DELETED) | YORK H F, LAWRENCE E O | PDF |
| 0404940 | 1953-12-18 | LETTER TO P PEARSON, SUBJECT: ARTICLE RELATIVE TO THE ABSORPTION BY CROPS OF RADIOACTIVITY PRODUCTS FROM THE ATOMIC EXPLOSIONS IN NEVADA ( NEVADA TEST SITE OPERATIONS ) | BRESNAHAN C A | PDF |
| 0405747 | 1953-12-19 | WEEKLY INSPECTION REPORT | UNK | PDF |
| 0404591 | 1953-12-21 | MEMO TO A C GRAVES, SUBJECT: PATE-PALMER WEATHER REPORT | CLARKSON P W | PDF |
| 0404694 | 1953-12-21 | LETTER TO J C BUGHER, SUBJECT: REPLY TO LETTER OF 12/8/53, REQUEST PERMISSION FOR COMMANDER TO SERVE AS A MEMBER OF THE AMERICAN DELEGATION IN A CONFERENCE COMPOSED OF REPRESENTATIVES OF CANADA | PUGH H L | PDF |
| 0406123 | 1953-12-21 | TWX TO D NARVER, SUBJECT: ELEVATION TARE FOR 200 FOOT TOWER ON RUBY DURING GREENHOUSE | DIETZE | PDF |
| 0406293 | 1953-12-21 | TWX, SUBJECT: TEST APPLIED IN WEAK AXIS DIRECTION QUES IN THAT STATION UNDER CONSIDERATION NEEDS TO BE ONLY FIVE FEET ABOVE GRADE | NARVER D | PDF |
| 0406900 | 1953-12-21 | THE PRESIDENT'S APPOINTMENTS | NONE | PDF |
| 0407260 | 1953-12-21 | MEMO TO M SALISBURY, SUBJECT: THE PRESIDENT'S PROPOSAL FOR SPECIFIC COUNTRIES | BARDING A H | PDF |
| 0407689 | 1953-12-21 | MONTHLY REVIEW OF ACTIVITIES NOVEMBER 1953 | UNK | PDF |
| 0400411 | 1953-12-21 | TWX TO CJTF7, SUBJECT: INFORM ALL WHO ARE INTERESTED IN THIS PALMER WEATHER THAT IT IS A STUDY SUBMITTED BY TWO METEOROLOGISTS AND DOES NOT REPORT NOT REFLECT THE OPINION OF CJTF7 | CLARKSON P W | PDF |
| 0120576 | 1953-12-21 | TWX TO GRAVES, SUBJECT: PATE-PALMER WEATHER PAPER | CLARKSON | PDF |
| 0120577 | 1953-12-21 | LETTER TO A C GRAVES, SUBJECT: PATE-PALMER WEATHER REPORT | CLARKSON P W | PDF |
| 0059433 | 1953-12-22 | OPERATION ORDER CTG 7.2 NO. 3-53 | LAHTI E H, MALLORY B J, WANDEL H E, DAKIN M H, GRILLS A | PDF |
| 0074010 | 1953-12-22 | NOTE BY THE SECRETARY, SUBJECT: AEC FILM ON OPERATION IVY (ENCL: LETTER TO R LEBARON RE SAME DTD 12/17/53) | SNAPP R B, STRAUSS L L | PDF |
| 0406291 | 1953-12-22 | TWX, SUBJECT: DWG ONE TWO FOUR FIVE HAS BEEN APPROVED | NARVER D | PDF |
| 0406292 | 1953-12-22 | TWX, SUBJECT: REQUESTED BY SHUMWAY LETTER JIG TWO TWO ONE THREE ZERO ( 22130 ) OF ONE ZERO DEC ( 10 DECEMBER )TO BE ACCOMPLISHED BY FIELD REVISION | NARVER D | PDF |
| 0408955 | 1953-12-22 | NOTE BY THE SECRETARY, SUBJECT: FILM ON OPERATION IVY ( ENCL: LETTER TO R LEBARON, SUBJECT: RE THE SAME, DATED 12/17/53 ) | SNAPP R B, STRAUSS L L | PDF |
| 0409313 | 1953-12-22 | MEMO TO K E FIELDS, SUBJECT: COMMISSION ACTION ON AEC 597/31 - UNLCEARED OBSERVER PROGRAM FOR OPERATION CASTLE | SNAPP R B | PDF |
| 0405817 | 1953-12-22 | TWX, SUBJECT: TENT TO BE STANDARD NOT TWO FEET HIGHER SMCLN MOVE AS CLOSE TO GUARD SHACK AS POSSIBLE BUT STILL HAVE TENT TWO FIVE FEET FROM FENCE AND FIVE FEET FROM ROAD | NARVER D | PDF |
| 0405818 | 1953-12-22 | TWX, SUBJECT: LOCATION OF TENT SHOWN ON REVISION FIVE AND SIX DWG TOW TWO ONE FIVE BEEN APPROVED QUES | BOETTCHER | PDF |
| 0400409 | 1953-12-22 | TWX TO CLARKSON, SUBJECT: (ILLEGIBLE) | GRAVES A C | PDF |
| 0400410 | 1953-12-22 | TWX TO CJTF7, ET AL, SUBJECT: WEATHER REPORT | CLARKSON P W | PDF |
| 0409003 | 1953-12-23 | NOTE BY THE SECRETARY, SUBJECT: PROPOSED STATEMENT ON EFFECT OF THERMONUCLEAR WEAPONS RESEARCH ON CIVIL DEFENSE PLANNING ( COMP DOC IS 409004 ) | SNAPP R B | PDF |
| 0409310 | 1953-12-23 | MEMO TO MR SNAPP, SUBJECT: MR MURRAY HAS WRITTEN TO THE PRESIDENT ON THIS SUBJECT BEFORE YOUR DRAFT LETTER REACHED ME | STRAUSS L L | PDF |
| 0409312 | 1953-12-23 | AEC MEETING NO. 949, 12-23-53, SUBJECT: CASTLE ANNOUNCEMENT | UNK | PDF |
| 0117360 | 1953-12-23 | OPERATION PLAN, PROJECT 6.4, OPERATION CASTLE (BUREAU OF SHIPS PROJECT TRANSIT - BLUE BOOK) | UNK | PDF |
| 0120574 | 1953-12-23 | TWX TO CLARKSON, SUBJECT: PATE-PALMER WEATHER PAPER | MCGINLEY | PDF |
| 0406901 | 1953-12-23 | THE PRESIDENT'S APPOINTMENTS | NONE | PDF |
| 0404595 | 1953-12-23 | MEMO TO C L TYLER, SUBJECT: U S WEATHER BUREAU TRACKS ATOMIC CLOUDS FROM THE NEVADA TESTS | MACHTA L | PDF |
| 0406122 | 1953-12-23 | TWX TO BOETTCHER, SUBJECT: 200 FOOT TOWER FOUNDATION | NARVER D | PDF |
| 0404020 | 1953-12-23 | MEMO TO FILES, SUBJECT: COST OF ORNL PARTICIPATION IN OPERATION CASTLE | BUTENHOFF R L | PDF |
| 0058487 | 1953-12-24 | PROGRESS REPORT TO THE JOINT COMMITTEE ON ATOMIC ENERGY, JUNE THROUGH NOVEMBER 1953 (U) (DELETED) (PARTIAL) | UNK | PDF |
| 0058488 | 1953-12-24 | PROGRESS REPORT TO THE JOINT COMMITTEE ON ATOMIC ENERGY, JUNE THROUGH NOVEMBER 1953 (U) PART III-WEAPONS (DELETED) (PARTIAL) (CASTLE OPERATION) | | PDF |
| 0058490 | 1953-12-24 | PROGRESS REPORT TO THE JOINT COMMITTEE ON ATOMIC ENERGY, JUNE THROUGH NOVEMBER 1953 (U) (DELETED) (PARTIAL) | UNK | PDF |
| 0074739 | 1953-12-24 | PROGRESS REPORT TO THE JOINT COMMITTEE ON ATOMIC ENERGY, JUNE THROUGH NOVEMBER 1953 (PARTIAL) (DELETED) | UNK, STRAUSS L L, NICHOLS K D | PDF |
| 0400417 | 1953-12-24 | MEMO, SUBJECT: OPERATION CONCEPT FOR THE J-3 SECTION (LASL) AT PPG | HOOPER P L | PDF |
| 0409309 | 1953-12-24 | LETTER TO R LEBARON, SUBJECT: NOW THAT THE OPERATIONAL PHASE OF CASTLE HAS BEGUN, IT IS CONSIDERED ADVISABLE TO OUTLINE OUR CONCEPT AS TO HOW THE OBSERVER PROBLEM SHOULD BE TREATED | STRAUSS L L | PDF |
| 0404720 | 1953-12-24 | MEMO TO J C BUGHER, SUBJECT: IVY PROGRAMS MENTIONED NOT REPEAT NOT CANCELED SIMILAR ACTIVITIES PLANNED CASTLE | LIBBY W F, WARREN S | PDF |
| 0405921 | 1953-12-24 | LETTER, SUBJECT: CONTRACT NO. AT-(29-2)-20 SUMMARY OF CONTRACT ITEM NUMBER ASSIGNMENTS | VANDINE D C | PDF |
| 0406290 | 1953-12-24 | TWX, SUBJECT: SECOND PRELIM DWG SIX FOUR ONE ZERO TRANSMITTED ONE FOUR DEC APPROVED WITHOUT CHANGE | NARVER D | PDF |
| 0406799 | 1953-12-24 | LETTER TO R HIRSCH, SUBJECT: JOINT TASK FORCE SEVEN PREPARING FOR NEW SERIES OF TESTS AT PACIFIC PROVING GROUNDS ( ENCL: RE: SAME ) | SALISBURY M | PDF |
| 0406861 | 1953-12-24 | LETTER TO R HIRSCH, SUBJECT: JOINT TASK FORCE SEVEN PREPARING FOR NEW SERIES OF TESTS AT PACIFIC PROVING GROUNDS ( DRAFT ANNOUNCEMENT RE: SAME ) | SALISBURY M | PDF |
| 0407261 | 1953-12-24 | INSTRUCTIONS, SUBJECT: PRESIDENT'S UN SPEECH: UTILIZATION OF PEOPLE AND MATERIALS WITH LOCAL SIGNIFICANCE | LAWRENCE R, HAMILTON J A, STREIBERT | PDF |
| 0407695 | 1953-12-24 | PROGRESS REPORT TO THE JOINT COMMITTEE ON ATOMIC ENERGY JUNE THROUGH NOVEMBER 1953 | UNK | PDF |