| Acc. No. | Date | Document title | Authors | File |
| 0405763 | 1954-04-12 | MEMO TO C L BOCHEMOHLE, SUBJECT: STATION 1200 RETAINING WALL | NARVER D L | PDF |
| 0403142 | 1954-04-12 | MEMO FOR RECORD, SUBJECT: BRAVO EVENT, OPERATION CASTLE (DELETED) | GRAVES A C, CLARKSON P W | PDF |
| 0403302 | 1954-04-12 | TWX, SUBJECT: REPORT ON NATIVES' CONDITION | UNK | PDF |
| 0404202 | 1954-04-12 | TWX, SUBJECT: FOR FIELDS FROM CLARKSON AND GRAVES YOUR ONE TWO ONE EIGHT ONE NINE ZEBRA WILL COMPLY STRICTLY WITH YOUR DESIRES REF YIELD OF UNION | NONE | PDF |
| 0404367 | 1954-04-12 | LETTER TO A C GRAVES, SUBJECT: RE NATIVES AT KWAJ | SHIPMAN T L | PDF |
| 0407694 | 1954-04-12 | MONTHLY STATUS AND PROGRESS REPORT MARCH 1954 PART II | NONE | PDF |
| 0411953 | 1954-04-12 | MEMO TO R B SNAPP, SUBJECT: REVISION OF SCHEDULE FOR PACIFIC TEST SERIES ( ATT: MEMO TO CLARKSON DATED 4/2/54 RE SAME; MEMO TO CLARKSON DTD 4/6/54 RE SAME ) (DELETED) | ARMSTRONG J L | PDF |
| 0411674 | 1954-04-13 | TWX TO J T BRENNAN, ET AL, SUBJECT: STATUS OF RESULTS OF URINE ANALYSIS OF RONGELAP NATIVES AND AIR WEATHER SERVICE PERSONNEL ( BRAVO EVENT, CASTLE OPERATION ) | SHIPMAN T L | PDF |
| 0116019 | 1954-04-13 | TWX TO WILLIAM HARRIS USAEC WASH DC ET AL, SUBJECT: FREQUENCY AND POWER OUTPUT OF RADIOSONDE TRANSMITTER | UNK | Missing |
| 0116129 | 1954-04-13 | TWX TO AEC WASHDC, SUBJECT: REPORT ON NATIVES AS OF 130001. ALL PATIENTS IMPROVING. (OPERATION CASTLE) | NONE | Missing |
| 0116135 | 1954-04-13 | TWX TO ZEN CTG7 PNT ONE ENIWETOK MI, SUBJECT: LISTS STATUS OF RRESULTS OF URINALYSIS OF RONGELAP NATIVES AND AIR WEATHER SERVICE PERSONNEL (OPERATION CASTLE) | UNK | Missing |
| 0116141 | 1954-04-13 | TWX TO J BUGHER USAEC WASHDC, SUBJECT: REF YOUR MSG 131005Z TRANSMITTERS WILL BE 50 TO 60 MEGACYCLES AT 25 TO 100 MILLIWATS OPERATING ON 100 FT HIGH BALLOON FLOATED HALF WAVE ANTENNA (OP CASTLE) | FRY | Missing |
| 0402648 | 1954-04-13 | MEMO TO W REYNOLDS, ET AL, SUBJECT: TEST NEWS LETTER ( ATT: ROUTE SLIP TO W REYNOLDS DTD 4/13/54 ) | DENTON | PDF |
| 0408436 | 1954-04-13 | AEC MEETING NO. 975 9:00 A.M., TUESDAY, APRIL 13, 1954 | UNK | PDF |
| 0410475 | 1954-04-13 | LETTER TO COMMANDER, STRATEGIC AIR COMMAND, OFFUITT AFB, SUBJECT: DECONTAMINATION OF B-36 AIRCRAFT ( ATT: REPORT OF DECONTAMINATION OF B-36 AIRCRAFT DTD 12 APRIL 1954 WITH CHARTS NOS. 1-4 ) | ESTES H M, MITCHELL F A | PDF |
| 0410835 | 1954-04-13 | CASTLE NATIVES - SUMMARY OF FALLOUT FROM SHOT BRAVO | NONE | PDF |
| 0407543 | 1954-04-13 | LETTER TO A C GRAVES, SUBJECT: OUTLINE FOR PROPOSED STUDY REGARDING RONGELAP NATIVES RETURNING TO THEIR HOMES | SHIPMAN T L | PDF |
| 0404563 | 1954-04-13 | LETTER, SUBJECT: H+N EMPLOYEES EXPOSED TO RADIATION | DURANT R C | PDF |
| 0404994 | 1954-04-13 | LETTER TO M A HOLMES, SUBJECT: RECENT FIELD TRIP CHECKING THE SHEEP SITUATION, CONSIDERABLE DEATH LOSS IN HIS RANGE HERD | BROWER S L | PDF |
| 0405048 | 1954-04-13 | MEMO TO J C BUGHER, SUBJECT: ESTIMATE OF BETA REP DOSE TO SKIN OF JAPANESE FISHERMEN | DUNNING G M | PDF |
| 0404091 | 1954-04-13 | TWX TO M EISENBUD, ET AL, SUBJECT: RE NEW HASL RAFT PROJECT | UNK | PDF |
| 0404325 | 1954-04-13 | JOINT MESSAGEFORM, SUBJECT: RE RADIOAUTOGRAPHS | UNK | PDF |
| 0404389 | 1954-04-13 | TWX, SUBJECT: PRESENT STATUS OF RESULTS OF URINE ANALYSIS OF RONGELAP NATIVES AND AIR WEATHER SERVICE PERSONNEL | UNK | PDF |
| 0404391 | 1954-04-13 | LETTER TO A C GRAVES, SUBJECT: PROPOSED STUDY DETERMINING RETURN HOME OF RONGELAP NATIVES | SHIPMAN T L | PDF |
| 0404396 | 1954-04-13 | CASTLE NATIVES - SUMMARY OF FALLOUT FROM SHOT BRAVO | NONE | PDF |
| 0403333 | 1954-04-14 | TWX TO JTF7, SUBJECT: BUGHER TO ARRIVE HONOLULU APRIL 17 TO CONSIDER PROBLEM FALLOUT & TO REVIEW WITH CRONKITE MEDICAL PROBLEMS & CONDITION OF EXPOSED NATIVES | BUGHER J C | PDF |
| 0403358 | 1954-04-14 | TWX TO A GRAVES, ET AL, SUBJECT: PRESENT STATUS OF RESULTS OF URINE ANALYSIS OF RONGELAP NATIVES AND AIR WEATHER SERVICE PERSONNEL ( BRAVO EVENT, CASTLE OPERATION ) | UNK | PDF |
| 0404089 | 1954-04-14 | TELETYPE, SUBJECT: RE NEW HASL RAFT PROJECT | BUGHER J C | PDF |
| 0404388 | 1954-04-14 | PROJECT HARDY ( THE RETURN OF THE NATIVE ) | NONE | PDF |
| 0408437 | 1954-04-14 | AEC MEETING NO. 976 2:15 P.M., WEDNESDAY, APRIL 14, 1954 - ACTIVITIES OF THE ATOMIC ENERGY LABOR - MANAGEMENT RELATIONS PANEL | UNK | PDF |
| 0071998 | 1954-04-14 | AEC MEETING MINUTES NO. 976, SUBJECT: INDEMNIFICATION FOR JAPANESE FISHERMEN (FUKURYU MARU INCIDENT, BRAVO EVENT, OPERATION CASTLE) | UNK | PDF |
| 0072326 | 1954-04-14 | NOTE BY THE SECRETARY, SUBJECT: CASTLE PLANNING (ENCL; LETTER TO L L STRAUSS, DTD 4-2-54) (DELETED) | SNAPP R B, LIBBY W F | PDF |
| 0076551 | 1954-04-14 | MEMO FOR THE RECORD, SUBJECT: EVACUATION OF RONGERIK AFTER SHOT BRAVO, OPERATION CASTLE (ATT: MESSAGE LIST TO CJTF-7) | HOUGHTON K H | PDF |
| 0116130 | 1954-04-14 | TWX TO AEC, SUBJECT: HEALTH REPORT ON RONGELAP NATIVES (OPERATION CASTLE) | UNK | Missing |
| 0116131 | 1954-04-14 | TWX TO UWFJA/MGR NYOO USAEC, SUBJECT: TASK FORCE ACFT EQUIPPED WITH STANDARD LOW FREQ BIRD DOGS. DETERMINING AVAILABILITY ELSEWHERE OF BIRD DOGS TO MATCH FREQUENCIES (OPERATION CASTLE) | UNK | Missing |
| 0116132 | 1954-04-14 | TWX TO J BUGHER USAEC WASHDC, SUBJECT: REFERENCE MSG 141300Z. DISCUSSION OF FREQUENCY. UNABLE TO OBTAIN AIRCRAFT FOR RAFT TESTING (OPERATION CASTLE) | FRY | Missing |
| 0116217 | 1954-04-14 | TWX TO JTF7, SUBJECT: BUGHER TO ARRIVE HONOLULU APRIL 17 TO CONSIDER PROBLEM FALLOUT & TO REVIEW WITH CRONKITE MEDICAL PROBLEMS & CONDITION OF EXPOSED NATIVES | BUGHER J C, BROWN H C, BROWN H C | Missing |
| 0116218 | 1954-04-14 | TWX TO M EISENBUD, SUBJECT: NEW HASL RAFT PROJECT REQUIRES TEST OPERATIONAL FEASIBILITY | BUGHER J C, BROWN H C | Missing |
| 0125302 | 1954-04-14 | PROJECT HARDY (THE RETURN OF THE NATIVE) (BRAVO EVENT, CASTLE OPERATION) | NONE | PDF |
| 0400430 | 1954-04-14 | MEMO TO DR. BUGHER, ET AL, SUBJECT: DRAFT RELEASE ON MILITARY VICTIMS OF FALLOUT ( ATTACH: DRAFT RELEASE BY DOD ) | SOUTHWICK R L | PDF |
| 0411892 | 1954-04-14 | NOTE BY THE SECRETARY, SUBJECT: CASTLE PLANNING (ENCL: LETTER TO LL STRAUSS, DTD 04/2/1954) (DELETED) | SNAPP R B | PDF |
| 0404579 | 1954-04-14 | AEC MEETING NO. 976, APRIL 14, 1954, SUBJECT: INDEMNIFICATION FOR JAPANESE FISHERMEN ( CASTLE OPERATION ) (PARTIAL) | NONE | PDF |
| 0405733 | 1954-04-14 | MEMO, SUBJECT: DEHUMIDIFICATION OF ROLLED-UP SCIENTIFIC STATIONS | BOETTCHER R A | PDF |
| 0405758 | 1954-04-14 | MEMO, SUBJECT: RE: DEHUMIDIFICATION OF ROLLED-UP SCIENTIFIC STAS | BOETTCHER R A | PDF |
| 0409761 | 1954-04-14 | MEMO TO K D NICHOLS, SUBJECT: MEETING WITH LIBBY AND RABI | FIELDS K E | PDF |
| 0410479 | 1954-04-14 | MEMO FOR THE RECORD, SUBJECT: EVACUATION OF RONGERIK AFTER SHOT BRAVO, OPERATION CASTLE ( ATT: MESSAGE LIST TO CJTF-7 ) | HOUGHTON K H | PDF |
| 0410607 | 1954-04-14 | PROJECT HARDY ( THE RETURN OF THE NATIVE ) ( BRAVO EVENT, CASTLE OPERATION ) | NONE | PDF |
| 0410667 | 1954-04-14 | TWX TO J LAWRENCE, SUBJECT: REQUEST RESULTS OF LASL BETA FILM READINGS | UNK | PDF |
| 0409760 | 1954-04-15 | MEMO TO FILES, SUBJECT: MEETING WITH DRS. LIBBY, RABI ET AL, | STUMPF J H | PDF |
| 0410604 | 1954-04-15 | TWX TO CHAIRMAN, AEC-HQ, SUBJECT: NECTAR EVENT, THIRTY-SIX HOUR ADVISORY; DISCUSSION OF FALLOUT (DELETED) | UNK | PDF |