| Accession Number: | 0405802 |
| Title: | MEMO, SUBJECT: CRANE HOIST ENGINEERING CORP COVERING THEIR RECOMMENDATION REGARDING THE DIFFICULTIES WHICH HAVE BEEN EXPERIENCED AT THE JOBSITE WITH THE GANTRY CRANE BUILDING 419 |
| Authors: | DIETZ H L, NARVER D L |
| Document Date: | n.d. |
| Crossindex: | |
| Locations: | NONE |
| Document Type: | CO |
| Orig Document No: | |
| Originating Agency: | H+N |
| Contr Agency: | DEPARTMENT OF ENERGY-ENVIRONMENTAL AND HEALTH |
| Pages: | 1 |
| Facil Loc: | DOE/EH MARSHALL ISLANDS |
| Collection: | DOE-EH |
| Keywords: | CASTLE OPERATION |
| PDF: | PDF (42K) |