| Accession Number: | 0411492 |
| Title: | APPENDIX IV - PROPOSED POWER ADDITIONS FOR FY 1955 - SITE ELMER |
| Authors: | UNK |
| Document Date: | 1955 |
| Crossindex: | |
| Locations: | SITE ELMER, MARSHALL ISLANDS |
| Document Type: | AX,DI |
| Orig Document No: | |
| Originating Agency: | H+N |
| Contr Agency: | DOE-NEVADA OPERATIONS |
| Pages: | 3 |
| Facil Loc: | H+N PPG |
| Collection: | DOE-NVOO |
| Keywords: | SITE LAYOUT, HOLMES AND NARVER INCORPORATED (H&N), POWER SUPPLY, INTERIM PERIOD, REDWING OPERATION, BUILDINGS, MAPS, PRE-REDWING OPERATION, POWER SYSTEMS |
| PDF: | PDF (109K) |