Acc. No. | Date | Document title | Authors | File |
0406463 | 1953-08-17 | TWX, SUBJECT: LEAD DASH INS MAY FOLLOW EXISTING TERRAIN | NARVER D | PDF |
0406464 | 1953-08-17 | TWX, SUBJECT: BEARING OF STATION ONE THREE ZERO TWO PNT ZERO THREE SHOULD BE THREE FIVE ONE DEGREES FOUR SIX MINUTES FIVE SIX SECONDS | NARVER D | PDF |
0406465 | 1953-08-17 | TWX, SUBJECT: IF AREA GRADE LESS THAN ELEVATION PLUS ONE ONE | NARVER D | PDF |
0406466 | 1953-08-17 | TWX, SUBJECT: REQUEST CLARIFICATION THREE FOOT MINIMUM DIMENSION BETWEEN FINISH FLOOR AND NATURAL GRADE DRAWINGS SIX TWO FIVE ZERO | BOETTCHER | PDF |
0406467 | 1953-08-17 | TWX, SUBJECT: REQUEST CONFIRMATION THICKNESS FIRST FLOOR WALL SHOWN RIGHT HAND SIDE SECTION DOG DRAWING SIX THREE TWO FIVE SHOULD BE SIX FEET | BOETTCHER | PDF |
0406468 | 1953-08-17 | TWX, SUBJECT: ESTIMATED PEAK ELEVATIONS PLUS ONE TWO WITH TOPOGRAPHY GENERALLY FLAT AND NOT RPT NOT HIGHER THAN PLUS EIGHT | BOETTCHER | PDF |
0406469 | 1953-08-17 | TWX, SUBJECT: REQUEST CONFIRMATION LEAD DASH IN POSTS STATION EIGHT ZERO PMT ZERO ONE FOLLOW EXISTING TERRAIN | BOETTCHER | PDF |
0017864 | 1953-08-15 | OPERATION CASTLE, OPERATION ORDER TASK GROUP 7.4, NUMBER 1-53, 15 AUGUST 1953 | ESTES H M | PDF |
0406253 | 1953-08-14 | TWX TO HOWELL, SUBJECT: HOME OFFICE APPLIED A CORRECTION TO THE BEARINGS OF THE EASY GEORGE GROUP OF ZERO DEGREES 8 MINUTES 55 SECONDS | NARVER D | PDF |
0406255 | 1953-08-14 | TWX TO D NARVER, SUBJECT: REQUEST TO FURNISH HOME OFFICE DEVELOPED COORDINATES FOR PETER ITEM 1-10 DOG AND 1-27 ON GEORGE FROM TRAVERSE SHOWN | UNK | PDF |
0406256 | 1953-08-14 | TWX TO BOETTCHER, SUBJECT: WHEN CAN WE EXPECT RESULTS OF LOCAL TRIANGULATION REFERRED TO IN OUR MEMO 7302 OF AUGUST 5 | NARVER D | PDF |
0406470 | 1953-08-14 | TWX, SUBJECT: REQUEST YOU FURNISH HOME OFFICE DEVELOPED COORDINATES FOR PETER ITEM ONE THRU TEN ON SITE DOG AND ONE THRU TWO SEVEN ON SITE GEORGE FROM TRAVERSE SHOWN ON FS RPT FS FIVE ZERO ONE THREE | UNK | PDF |
0406471 | 1953-08-14 | TWX, SUBJECT: STOP ALL WORK ON SCIENTIFIC STATIONS ONE ONE FIVE | UNK | PDF |
0406472 | 1953-08-14 | TWX, SUBJECT: CONCRETE WALL IN STATION ONE TWO ZERO ONE UNDERGOING REVISION | NARVER D | PDF |
0408968 | 1953-08-14 | LETTER TO L STRAUSS, SUBJECT: CONVERSATION ON THE PACIFIC TEST FILM AND THE PROSPECTS OF A PUBLIC RELEASE ON IT THIS FALL ( COMP DOCUMENTS ARE 408967,408969 ) | PETERSON V | PDF |
0405841 | 1953-08-14 | TWX, SUBJECT: REUR ENGMSG THREE TWO ONE SEVEN DEFER ACTION UNTIL SPAIN ANY MYSELF ARRIVE AT JOBSITE LAST WEEK OF AUGUST | NARVER D | PDF |
0405842 | 1953-08-14 | TWX, SUBJECT: EXCHANGE SECURITY LIGHTS PURCHASED FOR ASSEMBLY AREA AT ELMER WITH THOSE INSTALLED AROUND ADMINISTRATION COMPOUND TO DECREASE GLARE EFFECT IN BARRACKS AREA | UNK | PDF |
0405843 | 1953-08-14 | TWX, SUBJECT: ENGINEERING DOING THE DESIGN AND DRAWINGS FOR PARACHUTE TOWER AND CONCRETE FLOOR IN BLDG ONE ONE EIGHT QUES | UNK | PDF |
0408494 | 1953-08-13 | 36TH MEETING OF THE GENERAL ADVISORY COMMITTEE TO BE HELD IN ROOM 213 AUGUST 17, 18, AND 19 | DODSON R W | PDF |
0408970 | 1953-08-13 | MEMO TO FIELDS, SUBJECT: " SECRET " VERSION OF IVY FILM | STRAUSS L L | PDF |
0409345 | 1953-08-13 | LETTER TO P W CLARKSON, SUBJECT: NEW OUTLINE ON THE COMMISSION'S FILE REQUIREMENTS FOR CASTLE | FIELDS K E | PDF |
0406257 | 1953-08-13 | TWX TO BOETTCHER, SUBJECT: DESIRE LOCATION OF BUILDING 256 FRED AND LOCATION OF LANDING RAMP ON SALLY | NARVER D | PDF |
0406258 | 1953-08-13 | TWX TO D NARVER, SUBJECT: MARCH 12 SHOWS HIGH TIDE LINE AND TRIANGULATION STATIONS | BOETTCHER | PDF |
0406259 | 1953-08-13 | TWX TO BOETTCHER, SUBJECT: LOCATION OF STATION 1302.02 IS NORTH 146250 AND EAST 171050 | NARVER D | PDF |
0406260 | 1953-08-13 | TWX TO BOETTCHER, SUBJECT: NEED FOLLOWING TO ANSWER ENGMSG 2933 | NARVER D | PDF |
0406473 | 1953-08-13 | TWX, SUBJECT: SPAIN INDICATES SHUMWAY OF LASL WILL MAKE A PERSONAL INSPECTION OF THE TREE STAND AND DETERMINE FEASIBILITY OF THIS PROPOSED PROJECT | NARVER D | PDF |
0406474 | 1953-08-13 | TWX, SUBJECT: EIGHT SEVEN SEVEN EIGHT DRAWING TWO TWO ZERO NINE | BOETTCHER | PDF |
0406475 | 1953-08-13 | TWX, SUBJECT: LOCATION OF STATION ONE THREE ZERO TWO PNT ZERO TWO IS NORTH ONE FOUR SIX TWO FIVE ZERO AND EAST ONE SEVEN ONE ZERO FIVE ZERO | NARVER D | PDF |
0406476 | 1953-08-13 | TWX, SUBJECT: APPROXIMATE PEAK ELEVATIONS BETWEEN STATION TWO ZERO AND STATIONS ONE FOUR ZERO TWO CMM ONE FOUR ZERO THREE PNT ZERO ONE CMM ONE FOUR ZERO THREE PNT ZERO TWO | NARVER D | PDF |
0406477 | 1953-08-13 | MEMO TO D L NARVER, SUBJECT: TRANSMITTAL OF PRINTS | BOETTCHER R A | PDF |
0072317 | 1953-08-13 | AEC MEETING MINUTES NO. 893, DTD 7-23-53, SUBJECT: DISCUSSION WITH MR. GRAVES ON CASTLE PROGRAM (DELETED) | SNAPP R B | PDF |
0073290 | 1953-08-13 | AEC GENERAL ADVISORY COMMITTEE MEETING NO. 36, AUG 17-19, 1953, SUBJECT: WEAPONS, HORN AND GABRIEL; CIVIL POWER; RESEARCH | DODSON R W | PDF |
0404024 | 1953-08-13 | LETTER TO R CHESNEY, SUBJECT: OPERATION CASTLE ( NO ATTACHMENTS ) | BUGHER J C | PDF |
0412055 | 1953-08-13 | AEC MEETING 893, SUBJECT: 2:15 P.M. THURSDAY JULY 23, 1953 DISCUSSION WITH MR. GRAVES ON CASTLE PROGRAM (DELETED) | SNAPP R B | PDF |
0406478 | 1953-08-12 | MEMO TO D L NARVER, SUBJECT: SAND SPITS FOR PROJECT 1.2B | BOETTCHER R A | PDF |
0406479 | 1953-08-12 | TWX, SUBJECT: AUXILIARY EXHAUST HEADER ABOVE FAN ABLE DOES NOT LEAVE BLDG AND IS TO BE REMOVED | NARVER D | PDF |
0406480 | 1953-08-12 | TWX, SUBJECT: REQUEST FURTHER CLARIFICATION OF REQUIREMENTS FOR DUKW RAMP LOCATION | UNK | PDF |
0406481 | 1953-08-12 | TWX, SUBJECT: CONSTRUCTION ANTICIPATES STARTING CONSTRUCTION OF STATION SIX ZERO IMMEDIATELY | NONE | PDF |
0406482 | 1953-08-12 | TWX, SUBJECT: LASL WILL TRY TO PUT DUKW RAMP ON OCEANSIDE AND TO UTILIZE THE ISLAND AS YOU HAVE CONSTRUCTED IT | NARVER D | PDF |
0407675 | 1953-08-12 | MONTHLY STATUS AND PROGRESS REPORT JULY 1953 PART II | NONE | PDF |
0405852 | 1953-08-12 | LETTER TO D L NARVER, SUBJECT: DRAWINGS OF THE ENIWETOK BIOLOGICAL STATION DESIGNATED BUILDING 218 - ELMER | WILBUR K M | PDF |
0405853 | 1953-08-12 | TWX, SUBJECT: ERECTION DIAGRAM REQUIRED | BOETTCHER | PDF |
0404714 | 1953-08-11 | LETTER TO J C BUGHER, SUBJECT: PROPOSED RAD-SAFE MONITORING PLAN OUTLINED ( ENCL: MEMO, SUBJECT: RADIOLOGICAL HAZARDS IN THE MARSHALL ISLANDS AREA DURING OPERATION CASTLE, DTD 7/30/53 ) | CLARKSON P W | PDF |
0405171 | 1953-08-11 | MEMO TO M W BOYER, SUBJECT: MONTHLY STATUS AND PROGRESS REPORT, JULY 1953 - DIVISION OF BIOLOGY AND MEDICINE ( ENCLOSURE: REPORT ) | BUGHER J C | PDF |
0405854 | 1953-08-11 | TWX, SUBJECT: TRANSPARENCIES OF ERECTION DIAGRAM AND DETAILS NR THREE HOW DASH SIX ZERO THREE DASH SIX ZERO FOUR AND SIX ZERO FIVE | UNK | PDF |
0406261 | 1953-08-11 | TWX TO D NARVER, SUBJECT: CONFIRM TOWER ORIENTATIONS SHOWN DRAWINGS 2233 | BOETTCHER | PDF |
0406262 | 1953-08-11 | TWX TO D NARVER, SUBJECT: ADVISE REGARDING STATUS OF REVISIONS DRAWING 2209 | BOETTCHER | PDF |
0406263 | 1953-08-11 | TWX TO BOETTCHER, SUBJECT: MAXIMUM DIFFERENCE IN ADJACENT FOOTINGS TO BE LESS THAN FIVE FEET | NARVER D | PDF |
0406264 | 1953-08-11 | TWX TO BOETTCHER, SUBJECT: MAXIMUM DIFFERENCE IN ADJACENT FOOTINGS TO BE LESS THAN FIVE FEET | NARVER D | PDF |
0406265 | 1953-08-11 | TWX TO HOWELL, SUBJECT: LOCATION OF STATION 1342 IS TO BE ALONG THE AZIMUTH INDICATED ON DWGS | NARVER D | PDF |