Acc. No. | Date | Document title | Authors | File |
0406439 | 1953-09-08 | TWX, SUBJECT: YOU MISINTERPRETED HOW NAN NINE ONE ZERO EIGHT COMPLETELY | NARVER D | PDF |
0406440 | 1953-09-08 | TWX, SUBJECT: LACKING SPECIFIC STRENGTH REQUIREMENTS ON A APPROVED DRAWING SIX THREE ZERO FOUR | BOETTCHER | PDF |
0406441 | 1953-09-08 | TWX, SUBJECT: TWO FIVE ZERO ZERO PETER SUGAR ITEM MASS CONCRETE BEING USED BETWEEN TOP OF LEDGE AND BOTTOM OF FOOTING | BOETTCHER | PDF |
0404691 | 1953-09-08 | MEMO, SUBJECT: INTERPRETATION OF THE STANDARDS OF RADIOLOGICAL EXPOSURE ( ENCL: INTERPRETATION OF THE STANDARDS OF RADIOLOGICAL EXPOSURE ) | BUGHER J C | PDF |
0409344 | 1953-09-08 | MEMO FOR GENERAL FIELDS, SUBJECT: PROPOSED PROGRAM FOR CASTLE WAS MADE THAT MID-SEPTEMBER WAS PROBABLY THE LATEST DATE ON WHICH WE MIGHT SETTLE ON THE NUMBER OF EVENTS | STRAUSS L | PDF |
0406226 | 1953-09-07 | MEMO TO R A BOETTCHER, SUBJECT: TRANSMITTAL OF SURVEY DATA - STATION 1341 DELTA | BOETTCHER R A | PDF |
0406228 | 1953-09-04 | MEMO TO D L NARVER, SUBJECT: LOCATIONS OF STATIONS 10, 30, 1210 AND 1342 SITES DOG, GEORGE AND LAGOON | BOETTCHER R A | PDF |
0406442 | 1953-09-04 | MEMO, SUBJECT: COMPLETION ESTIMATE, CONTRACT ITEM A-4 CLEAR AND GRADE CAMP AREA-TARE | LIVESAY D A | PDF |
0406443 | 1953-09-04 | TWX, SUBJECT: REQUEST YOU INDICATE ON NEXT REVISION DRAWING SIX THREE FOUR ONE OVERALL DIMENSION STATIONS TWO FOUR ZERO ZERO TO EDGE O SIX INCH IS LAB | BOETTCHER | PDF |
0405838 | 1953-09-04 | TWX, SUBJECT: VERIFY THAT SHEET PILLING MUST BE CUT DOWN TO ELEVATION NINE PNT SIX SEVEN AT APPROACHES TO WOOD DECK AS SHOWN IN SECTION EASY | UNK | PDF |
0405839 | 1953-09-04 | TWX, SUBJECT: REGARDING MOORING PILE LOCATIONS AND REQUIREMENTS ON PENETRATION OR MINIMUM DRIVING RESISTANCE USING MCKIERNAN TERRY NINE BAKER THREE HAMMER | BOETTCHER | PDF |
0405846 | 1953-09-04 | MEMO TO D L NARVER, SUBJECT: TELETYPE REPLY REQUESTED, BUILDING 419 - ELMER | BOETTCHER R A | PDF |
0405847 | 1953-09-04 | MEMO TO D L HARVEY, SUBJECT: TELETYPE REPLY REQUESTED, BUILDING 419 - ELMER | BOETTCHER R A | PDF |
0405848 | 1953-09-04 | MEMO, SUBJECT: ENGINEERING CHANGE ORDER NO. 3820 | EAST C L | PDF |
0405849 | 1953-09-04 | MEMO TO S P HOWELL, SUBJECT: REQUEST FOR REFURNISHING CAMCO FACILITIES | NARVER D L | PDF |
0405840 | 1953-09-03 | TWX, SUBJECT: ENGMSG THREE FIVE BOT ZERO DOES NOT APPLY | BOETTCHER | PDF |
0405925 | 1953-09-03 | LETTER TO FIELD MANAGER, SUBJECT: CONTRACT NO. AT-(29-2)-20 ASSIGNMENT OF NEW CONTRACT ITEM NUMBERS | VANDINE D C | PDF |
0406229 | 1953-09-03 | MEMO, SUBJECT: 18 MAN BARRACKS - PLANS JOB 640 | BOETTCHER R A | PDF |
0406230 | 1953-09-03 | TWX TO BOETTCHER, SUBJECT: PLEASE FURNISH THIS OFFICE WITH THE FIELD COORDINATES FOR STATION 101 | DIETZE | PDF |
0406231 | 1953-09-03 | TWX TO BOETTCHER, SUBJECT: 3340 STATING THAT ITEM 4 OF MEMO 7302 COMPLETED | DIETZE | PDF |
0406444 | 1953-09-03 | MEMO TO S P HOWELL, SUBJECT: LATRINES NEAR STATIONS 20, 50 AND 60 LETTER J-19748 DATED AUGUST 31, 1953 | NARVER D L | PDF |
0406445 | 1953-09-03 | TWX, SUBJECT: STRUCTURE TO BE SEVEN THREE PNT ZERO TWO AS SHOWN ON DRAWING SIX THREE ZERO EIGHT | NARVER D | PDF |
0406446 | 1953-09-03 | TWX, SUBJECT: REFER NITE DRAWING SIX THREE FOUR ONE CONCERNING OPTIONAL USE OF BEARING PILES TWO FOUR ZERO ZERO STATIONS | BOETTCHER | PDF |
0408967 | 1953-09-03 | NOTE BY THE SECRETARY, SUBJECT: RELEASE OF PACIFIC TEST FILM ( COMP DOCUMENTS ARE 408968-408969 ) | SNAPP R B | PDF |
0074447 | 1953-09-03 | MEMO TO STRAUSS, SUBJECT: COMMISSIONS EMERGENCY CAPABILITY (DELETED) | ZUCKERT E M | PDF |
0402732 | 1953-09-03 | MEMO TO H H HAIGHT, SUBJECT: ANALYSIS OF BIOLOGICAL WEAPONS EFFECTS PROGRAM ( ENCL 1: BIOMEDICAL AIR BLAST INJURIES, DIRECT: ENCL 2: BIOMEDICAL THERMAL EFFECTS; ENCL 3: THERMAL EFFECTS ON ( CONT, ) | RANKIN H H | PDF |
0406232 | 1953-09-02 | TWX TO BOETTCHER, SUBJECT: FOLLOWING INFORMATION RECEIVED FROM ( ) TODAY DESIGNATING BORROW AREAS | DIETZE | PDF |
0406233 | 1953-09-02 | MEMO TO D L NARVER, SUBJECT: TRANSMITTAL OF SURVEY DATA | BOETTCHER R A | PDF |
0406234 | 1953-09-02 | MEMO TO D NARVER, SUBJECT: DUKW RAMP, STATION 20 | HOWELL S P | PDF |
0406447 | 1953-09-02 | MEMO TO D NARVER, SUBJECT: DUKW RAMP, STATION 20 | HOWELL S P | PDF |
0406448 | 1953-09-02 | TWX, SUBJECT: REURMSG THREE FIVE FIVE NINE | DIETZE | PDF |
0407622 | 1953-09-02 | LETTER TO G M DUNNING, SUBJECT: BUSTER-JANGLE RAD-SAFE REPORT | WHITE T N | PDF |
0405926 | 1953-09-02 | CONTRACT FEATURE NUMBERS CONTRACT AT-(29-2)-20 | NONE | PDF |
0405850 | 1953-09-01 | MEMO TO R A BOETTCHER, SUBJECT: ASSEMBLY AREA-ELMER | NARVER D L | PDF |
0406449 | 1953-09-01 | MEMO TO D L NARVER, SUBJECT: STATION 1342, FINISH FLOOR ELEVATION | BOETTCHER R A | PDF |
0406450 | 1953-09-01 | MEMO TO D L NARVER, SUBJECT: STATION 1342, FINISH FLOOR ELEVATION | BOETTCHER R A | PDF |
0406451 | 1953-09-01 | MEMO TO H L DIETZE, SUBJECT: STATIONS 30 AND 40 - CONSOLIDATED WESTERNS STEEL | MANNING J H | PDF |
0406388 | 1953-09 | STATIONS PIPE NUMBER | NONE | PDF |
0406404 | 1953-09 | LIST OF ADDITIONAL MATERIALS + LABOR CALLED FOR IN REVISED PLANS | NONE | PDF |
0406235 | 1953-08-31 | MEMO TO D L NARVER, SUBJECT: TRANSMITTAL OF SURVEY DATA | BOETTCHER R A | PDF |
0406452 | 1953-08-31 | TWX, SUBJECT: ORIGINAL DRAWING INDICATED SIX BY SIX RECESS IN ROOM ONE WALL EXTENDED FULL WIDTH OF ROOM | BOETTCHER | PDF |
0076560 | 1953-08-31 | HISTORY OF TASK GROUP 7.4 PROVISIONAL (FOR THE PERIOD 15 JULY THROUGH 31 AUGUST 1953 (WITH BACKGROUND INFORMATION)) (DELETED) | POLAKOF M, SMEATON W E, SAUNDERS D F | Missing |
0406236 | 1953-08-29 | MEMO TO D L NARVER, SUBJECT: TRANSMITTAL OF TRAVERSE TRIANGULATION TIES T-3 (REV.1), AND T-12 | BOETTCHER R A | PDF |
0406453 | 1953-08-29 | MEMO TO D L NARVER, SUBJECT: STATION 1203 - CHARLIE | BOETTCHER R A | PDF |
0406238 | 1953-08-28 | TWX TO BOETTCHER, SUBJECT: DRAWING 2243 BEING REVISED TO SHOW THAT CLEARING IS REQUIRED, 50 FEET ON EITHER SIDE OF LINE OF SIGHT TO STATION 20 | DIETZE | PDF |
0406239 | 1953-08-28 | MEMO TO S P HOWELL, SUBJECT: ALIGNMENT OF STATIONS 1203, 2220, 2230 | NARVER D L | PDF |
0406455 | 1953-08-28 | TWX, SUBJECT: ADD FOLLOWING NOTE TO A STRUCTURAL SHEET | UNK | PDF |
0134714 | 1953-08-28 | THE NECESSITY FOR AND VALUE OF CONTINENTAL TESTS (DELETED) | UNK | PDF |
0123911 | 1953-08-28 | THE NECESSITY FOR AND VALUE OF CONTINENTAL TESTS (THIS DOCUMENT NOT AVAILABLE IN THE CIC COLLECTION) | NONE | PDF |
0406240 | 1953-08-27 | MEMO TO ENGINEERING FILE, SUBJECT: STATIONS 101 AND 1342 | BOETTCHER R A | PDF |